Waste Management in OpenERP
Waste % can be set at Operation level for each Operation in Bill of Material. In MPS the quantity of Sub Assembly products gets changed considering the waste percentage. Also the quantity of consumed products changes as per the waste percentage. In work Order, the Waste percentage or quantity can be entered as per actual.
Key Features
1) Waste % can be set at Operation level
2) WIP Products quantity also gets updated as per waste percentage
3) Waste % or quantity can be entered at Work Order level as per actual...
2) WIP Products quantity also gets updated as per waste percentage
3) Waste % or quantity can be entered at Work Order level as per actual...
Waste % at Operational level in BOM
No comments:
Post a Comment